论文部分内容阅读
[规范操作类4项](1)绑扎基础钢筋,应按规定安放钢筋支架、马凳,铺设走道板(脚手板)。(2)在高处(2m以上含2m)绑扎立柱钢筋时,不得站在钢筋骨架上或攀登骨架上下,必须搭设脚手架或操作平台和马道。(3)人工断料时,工具必须卡牢。(4)施工现场的各种安全防护设施,安全标志等,未经领导及安全员批准严禁随意拆除和挪动。[严格要求类4项](1)进入施工现场人员必须正确戴好合格的安全帽,系好下颚带,锁好带扣。
[4 standard operation class] (1) lashing basic steel reinforcement, should be placed in accordance with the provisions of steel stent, horse stool, laying aisle board (scaffold board). (2) Do not stand on the reinforcing steel frame or climb up and down the skeleton steel bar when it is in the height (2m and above including 2m), and must be provided with scaffold or operating platform and horse road. (3) manual cutting, the tool must be stuck. (4) Various safety protection facilities and safety signs on the construction site are strictly forbidden to be dismantled and moved without the approval of leaders and security personnel. [Strict requirements of class 4] (1) into the construction site personnel must wear a proper helmets properly, fasten the chin strap, lock the buckle.