论文部分内容阅读
我的发言代表华东水利学院参加三峡枢纽初步设计要点会议的五位代表的意见,我们这次参加会议,听了许多报告,阅读了有关文件,深深体会到长办提出的三峡水利枢纽初步设计要点报告是在党和毛主席指示的“积极准备,充分可靠”的指导思想下完成的。在这个报告中具体分析了两个坝区的各种复杂条件,许多基本论证绝大部分是正确的,对今后工作打下了巩固的基础。文件本身对水利科学技术也是一个贡献,因为它的论证是非常全面的。最大的成就是对三斗坪和南津关两个坝区作了全面的比较,论证了美Ⅷ坝段在工程地质条件、水文地质条件、地形条件、施工条件、造价、动能经济指标和枢纽布置等方面的优越性,经过到会代表的讨论,更进一步明确了报告中所提出的论点的正确性,今后固然还要进一步了解地质情况,但根据目前掌握的资料来判断:南津关坝址石灰岩地质复
My statement on behalf of Huadong Water Resources Institute took part in the opinions of the five representatives from the meeting on the preliminary design points for the Three Gorges Project. We attended this meeting, listened to many reports and read the relevant documents and deeply appreciated the preliminary design of the Three Gorges Project proposed by the CFO The key points report was completed under the guiding ideology of “active preparation, full and reliable” as indicated by the party and Chairman Mao. In this report, the various complex conditions of the two dam areas are analyzed in detail. Most of the basic justifications are correct, laying a solid foundation for future work. The document itself is also a contribution to water science and technology, because its argument is very comprehensive. The greatest achievement is a comprehensive comparison of the two dam areas of Sandouping and Nanjinguan. It is demonstrated that the US Ⅷ dam is under the conditions of engineering geological conditions, hydrogeological conditions, topographical conditions, construction conditions, cost, kinetic energy and hub layout The superiority of the project will be further clarified on the correctness of the arguments put forth in the report after discussion with the delegates. Although geological conditions are still to be further understood in the future, judging from the information currently available: the limestone geology complex