后浇带的施工涉及到模板、钢筋、混凝土、清理四大难题,但与模板、清理内容最为密切,因此作者暂时把后浇带的施工内容划分入模板分项工程。为使后浇带单项施工方案表达更详尽一些,另增加后浇带中的混凝土、钢筋施工内容。为了解决后浇带施工中的技术难度问题,需做一个后浇带施工方案,现以某工程后浇带施工方案为例,对其施工方法进行探讨。
After pouring with the construction of the template involves steel, steel, concrete, cleaning four major problems, but with the template, the most clean-up content, so the author temporarily post-pouring the construction content into the template sub-project. In order to make the post-pouring construction project with a more detailed expression of some of the other increase after pouring with concrete, steel construction content. In order to solve the problem of technical difficulty in the construction of post-pouring strip, a construction scheme of post-pouring strip should be made. The construction method of post-pouring strip of a project is taken as an example to discuss its construction method.