在岩土工程中监理人须按照行政法规及相关的法律的规定,并严格按照相关技术标准、设计文件及建筑工程合同的要求来施工,并且在控制工程的进度、质量和安全的同时,成本的控制在整个工程项目投资的全过程控制中也是及其重要的一个环节。通过对项目《岩土工程详细勘察报告》的分析,并结合建设的实际情况,把使用圆砾层的二氧化氯加药备间和变配电间的人工挖孔桩的持力层改为细沙层,这一改变共计减少人工挖孔桩总长度65、3米、就节约了工程造价达19.7万,共占总投资的1.5%。
In the geotechnical engineering supervision, the supervising person shall, in accordance with the provisions of the administrative regulations and relevant laws and in strict accordance with the relevant technical standards, design documents and the requirements of the construction contract, and in controlling the progress, quality and safety of the project, the cost The control of the entire project investment in the whole process of control is also an important part. Through the analysis of the project “Detailed Geotechnical Investigation Report” and in combination with the actual situation of the construction, the holding power of artificial digging piles between chlorine dioxide plus drug preparation room and substation with round gravel layer was changed to Fine sand layer, this change altogether reduced the total length of manual digging piles 65,3 meters, saving construction cost of 197,000, a total investment of 1.5%.