新乡市驻军某部去年从江苏××锅炉厂购进两台KZL240—7/95/70—AⅡ型热水锅炉,(与KZL4—8型相似)去年11月28日投入试运行,今年元月8日即因烟管胀口漏水严重,两台炉同时被迫停止运行。当时正值严冬,气温为0~-10℃,突然停止了3万多平方米的采暖面积供热,给部队生活、生产带来很大困难。为了查明漏水原因,我们到现场作了调查,发现漏水部位在第二回程的入口处,即后管
A unit of Xinxiang Garrison purchased two KZL240-7 / 95/70-A Ⅱ hot water boilers from Jiangsu ×× boiler plant last year (similar to the model KZL4-8) and put it into trial operation on November 28 last year. The first month of this year On the 8th, due to the serious leakage of smoke pipe mouth, two furnaces were forced to stop operating at the same time. At that time, it was a severe winter with a temperature of 0 to -10 degrees Celsius. Suddenly, more than 30,000 square meters of heating area heating was stopped, posing great difficulties to the army’s life and production. In order to find out the cause of the leak, we made a survey to the site and found that the leak site was at the entrance of the second return trip,