论文部分内容阅读
一、水电建设工期的历史变化及现状节约劳动时间是社会主义经济发展的首要课题。我国水电建设三十五年来,就装机容量和发电量的增长速度来看都是很快的,平均年递增率分别达15.8 %和15.2%,但就建设工期来看,则经历着曲折的发展过程。早在五、六十年代,我国就出现了一批搞得很快的工程,与世界先进工期水平比较毫不逊色;七、八十年代以来,特别是党的十一届三中全会以来,也涌现出了
First, the historical changes in the construction period of hydropower and the status quo Conservation of labor time is the primary issue of socialist economic development. Over the past 35 years since the construction of hydropower in our country, the growth rates of installed capacity and generating capacity are very fast. The average annual increment rate has reached 15.8% and 15.2% respectively. However, in terms of the construction period, it is undergoing twists and turns process. As early as the 1950s and the 1960s, a series of fast-moving projects have emerged in our country, which are comparable to the advanced ones in the world. Since the Third Plenary Session of the Eleventh Central Committee of the Party since the 1970s and the 1980s, Also emerged