由于我国地域幅员辽阔,南北温差大,当进入冬期施工的时间也相差很大,南方地区很少出现冬期施工。笔者就针对临沂地区的冬期施工谈点想法。临沂地区现在已经进入冬期施工,对于混凝土的浇筑和养护必须按照JGJ/T 104—2011《建筑工程冬期施工规程》要求进行施工。为了确保冬期浇筑混凝土的质量,我公司对施工单位还提出如下要求:(1)负责混凝土浇筑计划的管理者,必须天天收听或搜寻临沂市的天气预报,当日最低气温低于-3℃时,必须提前一天使用
Due to the vast territory of our country, the temperature difference between the north and south is large, and the time of entering the winter construction varies greatly, and the winter construction in the south rarely occurs. I would like to talk about winter construction in Linyi point of view. Linyi area has now entered the winter construction, pouring and curing of concrete must be in accordance with JGJ / T 104-2011 “winter construction procedures for construction” requirements for construction. In order to ensure the quality of concrete pouring in winter, our company also put forward the following requirements to the construction unit: (1) The manager in charge of concrete pouring plan must listen to or search the weather forecast of Linyi City every day. When the minimum temperature is below -3 ℃, Must be used one day in advance