安康水电厂计算机监控系统于1998年11月正式签定合同,1999年5月8日顺利投入现场运行。该系统的硬件选用了国际先进的 Alpha600au 工作站和光纤构成的双100 MB 快速以太网主干网,数据采集及控制器采用由双 CLU 的 Quantum 可编程控制器组成的现地控制单元,是目前国内继白山梯级和乌溪江梯级之后又一个主干网采用高速以太网的大型水电厂计算机监控系统。至
Ankang Hydropower Plant computer monitoring system in November 1998 formally signed a contract, May 8, 1999 successfully put into operation at the scene. The hardware of this system chooses the dual 100 MB fast Ethernet backbone composed of the international advanced Alpha600au workstation and optical fiber. The data acquisition and controller adopts the local control unit composed of double CLU’s Quantum programmable controller, Baishan cascade and the Wu Xi River cascade after another backbone using high-speed Ethernet large-scale hydropower plant computer monitoring system. to