论文部分内容阅读
本文提出用动态规划法与等微增率法相结合、以开停机指标数确定运行机组台号的水电站自动发电控制(AGC)新算法,以满足在线实时运行的要求.文中介绍了该法的简易方案在新丰江水电站上应用情况.
In this paper, a new AGC algorithm is proposed to determine the number of AGC stations running on the platform by using the combination of dynamic programming and equal increment rate method to meet the requirements of online real-time operation. Scheme application at Xinfengjiang Hydropower Station.