龙羊峡水电站是目前我国在建中最高的重力拱坝,最大坝高178米,底宽80米,拱坝半径261米,主坝长395米,分18个坝段,与两岸重力墩相联接。枢纽前沿总长1103.58米。水电站布置采用坝后式厂房型式,厂房与大坝之间是长70米的整体框架式结构的副厂房,厂房为斜置一字型。主厂房系全封闭厚壁结构,总长142.5米,宽51米,内装四台水轮发
Longyangxia Hydropower Station is currently the highest gravity dam under construction in our country. The maximum height of the dam is 178 meters, the width of the bottom is 80 meters, the radius of the arch dam is 261 meters, the length of the main dam is 395 meters, and 18 dam sections intersect with the gravity pier Join. The total length of hub is 1103.58 meters. Hydropower station layout with dam-style plant type, between the plant and the dam is 70 meters long overall structure of the vice-factory buildings, plant oblique type. The main plant is fully enclosed thick-walled structure, a total length of 142.5 meters, 51 meters wide, equipped with four water wheel