为解决上海电网日益严重的电力负荷峰谷差及事故紧急备用电源,缓解上海地区部分电力负荷不足的问题,本市于1996年起开始建造上海闸电燃气轮机发电厂。上海闸电燃气轮机发电厂的发电机组由4×100MW简单循环燃气轮机发电机组和2×
In order to solve the increasingly serious power load peak-valley difference and accident emergency backup power supply in Shanghai Power Grid and alleviate part of the electricity load shortage in Shanghai, Shanghai Municipality started construction of Shanghai ZGC gas turbine power plant in 1996. The generator set of the Shanghai ZGC gas turbine power plant consists of 4 × 100MW simple cycle gas turbine generator sets and 2 ×