论文部分内容阅读
本文介绍利用遥感技术调查列古洛多沟泥石流形成机制,提出了整治泥石流的方案(即修建渡糟的方案)。该方案现已施工。对保障铁路安全行车将取得良好的效果。
This paper introduces the investigation of the formation mechanism of debris flow in the Liguoluo Gully by using remote sensing technology and proposes a scheme of controlling the debris flow (ie, the scheme of constructing the calamus). The program is now under construction. To ensure the safety of railway traffic will achieve good results.