由冶金部主持的“铜录山矿Ⅳ号矿体尾砂胶结充填系统及自动控制”技术鉴定会,于9月23~26日在大冶有色金属公司召开。参加会议的有来自全国的冶金科研、设计、生产部门的29个单位,55名代表。会议期间,代表们听取了负责该项目研究任务的冶金部矿冶研究所和铜录山矿,关于该系统的组成、特征和主要技术经济指标的介绍,参观了现场,然后分组进行了认真的讨论和评价。会议认为,该系统是我国第一个全面实现了管道化和机械化,对充填参数能够自动检测及控制的胶结充填系统。经过一年多的实践获得了良好的技
Hosted by the Ministry of Metallurgical Department, “Copper recorded ore mine tailings No. Ⅳ cemented filling system and automatic control” technical appraisal meeting, September 23 to 26 held in Daye Nonferrous Metals. Attending the conference were 29 units and 55 delegates from metallurgical research, design and production departments across the country. During the meeting, delegates listened to the Ministry of Metallurgical Mines and Metallurgy Research Institute and the Copper Hill Mine responsible for the research tasks of the project. They introduced the composition, characteristics and major technical and economic indicators of the system, visited the site, and then conducted serious grouping Discuss and evaluate. The meeting considered that this system is the first cementing and filling system that has fully realized the plumbing and mechanization in our country and can automatically detect and control the filling parameters. After more than a year of practice has gained good skills