波拉里斯(Polaris)矿位于加拿大北极区的小康沃利斯岛。该地区航运季节很短,气候严寒。该矿有几个地下采场、一个安装在平底船上的选矿厂、一套精矿储存和装船设施,一栋生活福利办公大楼、一个小型机场。矿山所需的电力,由安装在平底船上的4台2300千瓦柴油发电机提供。通过直接与各发电机相连接的4.16千伏系统给各大型电动机供电,对所有其他负载,均供以600伏或120伏电。该柴油发电站是一个具有最大能量效率、并且热回收率是最高的总能量系统,预期全年回收的废热可满足工艺过程加热干燥和生活福利办公大楼供暖的需要。柴油发动机的冷却系统包括两个乙二醇-水回路、1个用于冷却增压空气和润滑油的“冷水”回路和1个用于冷却水套水的“热水”回路。每个回路都设有数个用于回收余热的热交换器和用于散发过剩热量的室外强制通风散热器。选厂区的1个水回路把来自水套水回路和废热锅炉的热量传输给各采暖设备、工艺过程和大楼供暖系统部分废气送到精矿干燥机。
The Polaris mine is located on Coronis Island in the Canadian Arctic. The shipping season is short and the climate is cold. The mine has several underground stopes, a dressing plant mounted on a punt, a concentrate storage and loading facility, a living welfare office building and a small airport. The electricity needed for the mine is provided by four 2300 kilowatt diesel generators installed on a punt. Each large motor is powered by a 4.16 kV system directly connected to each generator, with 600 V or 120 V for all other loads. The diesel power station is a total energy system with the highest energy efficiency and the highest heat recovery rate. It is expected that the waste heat recovered during the whole year will meet the needs of heating and drying process and living welfare office building heating. The diesel engine cooling system consists of two glycol-water circuits, a “cold water” circuit for cooling charge air and oil, and a “hot water” circuit for cooling the jacket water. Each circuit has several heat exchangers for waste heat recovery and outdoor forced draft radiators for excessive heat dissipation. A water circuit in the mill area transfers the heat from the jacket water circuit and the waste heat boiler to the heating equipment. The process and the exhaust gas from the heating system of the building are sent to the concentrate dryer.