前言葛洲坝电站是我国长江流域第一个大型水力枢扭工程,电站装有大型转浆式水轮机19台。转轮室是水轮机的重要工作部件,在机组运行中承受巨大的水力冲击、振动,转轮室通流部分的内衬将受到严重的气蚀、磨损破坏,直接影响到机组的效率、出力与正常运行。为此,近数十年来国内外的科研部门及制造厂都在设计结构、选材、制造工艺上采取多种措施,以改善和提高转轮室的质量。我厂在总结青铜峡、八盘峡、三门峡等电站轴流式水轮机转轮室生产经验的基础上,设计制造了葛洲坝
Introduction Gezhouba Hydropower Station is the first large hydro-hydraulic hinge project in the Yangtze River basin in China, with 19 large slurry-fed turbines. The runner room is an important working part of the turbine. During the operation of the unit, it is subjected to huge hydraulic impact and vibration. The lining of the runner room throughflow section will be seriously cavitated and worn, which will directly affect the efficiency, normal operation. To this end, in recent decades, domestic and foreign scientific research departments and manufacturing plants have taken various measures in the design of structures, material selection and manufacturing processes to improve and enhance the quality of the runner room. I plant in the summary of Qingtongxia, Bapanxia, Sanmenxia and other axial flow turbine runner room production experience, based on the design and manufacture of the Gezhouba