论文部分内容阅读
结合辽宁省清原县国营大苏河林场规划设计外业区划航片的转绘工作,对于如何选择转绘方法提高转绘精度、保证成图质量、提高工作效率的问题做了初步探索。现将其实验报告如下:一、实验地区的立地条件辽宁省清原县国营大苏河林场,地处长白山系千山山脉龙岗山脚下,境内最高峰-龙岗山海拔1100m,平均海拔高500-650m,相对高差700m。平均坡度在20°-35°之间,个别
Combining with the drawing and drawing of the aerial photographs of the planning and design of the Dasuhe Forest Farm in Qingyuan County of Liaoning Province, this paper makes a preliminary exploration on how to select the method of drawing and painting to improve the accuracy of drawing and mapping and the working efficiency. The experimental report is as follows: I. Site conditions in the experimental area State-owned Dasuhe Forest Farm in Qingyuan County of Liaoning Province is located at the foot of Longgang Mountain in the Qianshan Mountains of Changbai Mountain. The highest peak in the territory, Longgang Mountain, is 1100m above sea level with an average elevation of 500-650m , The relative elevation of 700m. Average slope between 20 ° -35 °, individual