根据界沟煤矿10#煤层1011工作面底板的富水情况,结合物探和钻探资料,分析认为注浆改造改造是1011工作面底板改造较合理的方案。基于现场的实际资料,套管深度设计为16m,钻孔深度为煤层底板下56m,注浆终压为5.5MPa,扩散半径为30m,布置了8个钻场87个注浆孔和18个检查孔,运用孔口压盖式注浆法,以单液水泥浆为主直接对含水层进行大量注浆。注浆改造后,运用检查孔检查了注浆质量,检查结果为注浆孔的水量由注浆前每个注浆孔的水量>30m3/h到注浆后每个检查孔水量<2.5m3/h,表明浆液有效地填充了底板的断层和裂隙,达到了改造底板的效果。
According to the water-rich situation of the floor slab of 1011 working face of 10 # seam in Jigou Coal Mine, combined with the geophysical and drilling data, it is considered that the grouting reconstruction is the more reasonable plan for the floor modification of 1011 working face. Based on actual field data, the casing depth is designed to be 16m. The drilling depth is 56m under the coal seam floor, the grouting final pressure is 5.5MPa, the diffusion radius is 30m, 87 grouting holes are arranged in 8 drilling sites and 18 inspections Hole, the use of orifice gland grouting method to single-liquid slurry directly to the aquifer for a large number of grouting. Grouting transformation, the use of inspection holes to check the quality of the grouting, the test results for the grouting hole water injection grouting before the hole by the amount of water per hole> 30m3 / h to the amount of water per hole after grouting <2.5m3 / h, indicating that the slurry effectively filled the floor of the fault and cracks, to transform the floor effect.