论文部分内容阅读
随着云电送粤电力规模的增大,厂网高频率协调配合问题变得十分重要。经对云南电网厂网频率间协调配合关系的研究,提出了电网高周问题和 (OPc)功能协调配合方案,实践证明了方案的可行性,保障了电网的安全稳定运行。
With the increase of the scale of cloud transmission to Guangdong Electric Power, the coordination of high-frequency network with the plant becomes very important. After studying the coordinative relationship between power grid frequency and power grid frequency in Yunnan Power Grid, this paper put forward a scheme of coordination and cooperation between power grid high cycle and OPc function. The feasibility of this scheme was proved by practice and the safe and stable operation of power grid was ensured.