Scour Morphology around Bridge Abutmentswith Non-Uniform Sediment under Ice Cover

来源 :35th IAHR World Congress(第三十五届国际水利学大会) | 被引量 : 0次 | 上传用户:wangjue419
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This paper presents the results from two experimental flume studies on the local scour morphology around semi-circular bridge abutments.
其他文献
Using geotextile materials to lay on the downstream of dam before the exceeding standard flood can effectively delay the dam breach time and enhance the competence in fending off the dam breach risk.
Erosion is a primary concem for rivers in upland and hilly areas.Concrete lined channel used to be the solution to cope with high velocity, but rising environmental concerns are placing demands for ec
The hyper-concentration flood of the tributaries of the upper Yellow River in Inner Mongolia causes the forming of the sand bar in the confluence, choking the main stream of Yellow River.
In this paper, 13 groups of gravel incipient motion experiment data are obtained and 50 groups of data from 7 researchers are collected.
One of the major problems caused by high-speed flow in tunnel of the High Dam project is flow cavitation which can cause wall surface cavitation erosion.
Both the section form and plant layout of ecological river affect the flow structure, while ecological functions and riverbank stability of an ecological river are determined by flow structure.
In the narrow valley, due to the limitations of the model of hydropower development, general layout, water head, flow, hydrology, geology, topography and others, sometimes the Jet-over Powerhouse will
Flip buckets are commonly employed to dissipate energy by discharging flow away from the dam toe into a plunge pool or a river channel.Dovetail-shaped flip bucket is a novel design type to be consider
In process of the river closure, as the closure gap narrows continuously, both the water head between the upstream and downstream of closure dike and the flow velocity in the closure gap increase grad
Under the condition of overtopping or discharging through a prefabricated channel, the author had conducted a series of dam failure experiments of single landslide dam and two cascade landslide dams b