In process of the river closure, as the closure gap narrows continuously, both the water head between the upstream and downstream of closure dike and the flow velocity in the closure gap increase gradually, leading to riverbed scour, which will influence the stability of closure dike, so it is necessary to research clearly the scour law of riverbed to achieve safe closure.
其他文献
The water flow on sluice downstream in tidal estuary is complicated, In this study, the multi-step stilling basins is experimentally investigated, taking the Wuniu new sluice project, Linhaipu Sluice,
Because of the frequently extreme climate, embankments break at times under the condition of exceeding standard flood.In this paper, a method of protecting embankment downstream slope by using geo-syn
Using geotextile materials to lay on the downstream of dam before the exceeding standard flood can effectively delay the dam breach time and enhance the competence in fending off the dam breach risk.
Erosion is a primary concem for rivers in upland and hilly areas.Concrete lined channel used to be the solution to cope with high velocity, but rising environmental concerns are placing demands for ec
The hyper-concentration flood of the tributaries of the upper Yellow River in Inner Mongolia causes the forming of the sand bar in the confluence, choking the main stream of Yellow River.
In this paper, 13 groups of gravel incipient motion experiment data are obtained and 50 groups of data from 7 researchers are collected.
One of the major problems caused by high-speed flow in tunnel of the High Dam project is flow cavitation which can cause wall surface cavitation erosion.
Both the section form and plant layout of ecological river affect the flow structure, while ecological functions and riverbank stability of an ecological river are determined by flow structure.
In the narrow valley, due to the limitations of the model of hydropower development, general layout, water head, flow, hydrology, geology, topography and others, sometimes the Jet-over Powerhouse will
Flip buckets are commonly employed to dissipate energy by discharging flow away from the dam toe into a plunge pool or a river channel.Dovetail-shaped flip bucket is a novel design type to be consider