论文部分内容阅读
DETERIORATION AND FAILURE OF MODERN LARGE HYDROGENERATOR STATOR WINDINGS
【机 构】
:
Iris Power, Canada
【出 处】
:
第二届水力发电技术国际会议
【发表日期】
:
2009年7期
其他文献
Voith Siemens Hydro develops,designs and supplies pumped storage equipment with more than hundred years of experience.The increasing demand for peaking power and the request for more flexibility in th
会议
Xiang Jia Ba hydro power plant,the biggest air cooled hydro generator with an output of 890 MVA will be installed.The machine is designed with a 23 kV stator winding which finally allows an optimized
会议
Water-power is the only renewable energy that can be generated reliably at industrial scale to meet increasing demands for clean energy resources.However,key issues such as cavitation and associated h
会议
EXPLORATION AND PRACTICE ON EQUIPMENT OF 700MW AIR COOLING HYDROELECTRIC UNITS IN LONGTAN HYDROPOWER
Longtan Hydropower Station is the first gigantic hydropower project constructed in the 21st century in China.Longtan has led out a new mode of producing and manufacturing pivotal equipments such as hy
Exploration and Practice of Integrated Control & Management Mode of the Hydro Plant Group along Wuji
Aiming at the fact that cascading hydro power plants along Wujinag River were operated individually,this paper proposes the remote integrated management mode of cascading hydro plants,demonstrates the
会议
In this paper,the Author introduces development and advance in the researching and developing of hydroelectric equipment of Dongfang Electrical Machinery Co.especially the progress made in the digest