本文针对104国道管柄大桥93m高墩的翻模施工技术进行了全面的技术阐述和定向分析,介绍了翻转模板的构造组成、施工原理、施工工艺、重难点分析,同时叙述了高墩施工质量控制、翻模施工中应注意的事项,也进行了翻模施工与其他施工方法的特点比较。通过分析总结,以期在实际工程中有所参考借鉴。
In this paper, a comprehensive technical explanation and directional analysis of the turn-over construction of the 93m high pier of the 104 National Highway Bridge are introduced. The structural composition, construction principle, construction technology and heavy and difficult points of the turnover template are introduced. Meanwhile, the construction quality of high pier Control, turn over the mold construction should pay attention to the matters, also carried out the turn mold construction and other construction methods features comparison. Through the analysis and summary, with a view to practical reference in engineering.