论文部分内容阅读
由云南省金属学会采矿学术委员会和昆明工学院科技处组织,于一九八三年二月二十四日至二十五日在昆明召开了林歹矿床放矿模拟试验评议会,会议代表共三十六名。评议会对昆明工学院提交的《贵州铝厂清镇铝矿林歹矿床崩落采矿法放矿模拟试验报告》、《模拟矿岩物理性质测定试验报告》、《端部放矿时放出体松动体参数试验报告》、《底部放矿时放出体松动体参数试验报告》、《无底柱分段崩落法采
Organized by Mining Academic Committee of Yunnan Metal Institute and Science and Technology Department of Kunming Institute of Technology, a council for the draining of Linhe ore deposit was held in Kunming from February 24 to February 25, 1983, representing a total of Thirty-six. The council submitted to the Kunming Institute of Technology, “Guizhou Aluminum Plant Qingzhen aluminum mine Lin ore bed run-off ore mining simulation test report”, “Physical and chemical properties of ore rock test report”, “ Parameter Test Report ”,“ Test Report of Releasing Loose Body Parameters at Bottom Release ”," Slabless Caving Method