论文部分内容阅读
德兴铜矿是我国发展中的大型矿山,具有现代化采矿设备,但通信设备不十分完善,生产调度管理系统与现代化的生产手段不相适应。电子部三所经过现场试验,1987年3月在该矿电子中心站的合作下,为矿区进行了现代化图象通信的全面规划,签订了第一期工程协议,为矿生产调度指挥系统设计了成套图象通信网络,经安装、调试、系统参数测量和试用,技术参数符合设计要求,5月30日提供竣工报告,6月4日正式通过验收,现已正式交付使用。该网络为三级调度管理图象通信系统,对选矿厂的主母机、球磨机等主要设备和重要生产环节进行现
Dexing Copper Mine is a large-scale mine under development in our country with modern mining equipment, but the communication equipment is not perfect, and the production scheduling management system is not compatible with the modern means of production. Electronics Division three after field tests, in March 1987 in the mine electronic center under the cooperation of the mine for the modernization of the overall planning of image communications, signed the first phase of the project agreement for the mine production scheduling command system designed Complete sets of image communication network, the installation, commissioning, measurement and trial of system parameters, technical parameters meet the design requirements, May 30 to provide the completion report, June 4 formally passed the acceptance, is now officially delivered. The network for the three dispatch management image communications system, the main concentrator of the concentrator, ball mill and other major equipment and important production processes are now