论文部分内容阅读
介绍了湛江电厂二期工程凝结水精处理设备的配置、锥体分离技术的特点、运行情况、存在问题及改进措施。机组启动期间 ,凝结水精处理器出水水质各项指标均符合要求
This paper introduces the configuration of condensate polishing equipment, the characteristics, operation status, existing problems and improvement measures of cone separation technology in Zhanjiang Power Plant Phase II Project. During the startup of the unit, all the indexes of the water quality of the condensate polishing processor met the requirements