论文部分内容阅读
为解决上海轨交建设与城市交通拥堵的矛盾,研究软土地区非开挖实施车站。以14号线静安寺站为例,研究了适合软土地区的非开挖站站型及总体布置,并对非开挖法车站实施的难点,如站台宽度、实施方式、管节接头、抗震性能进行研究,并提出解决方案。
In order to solve the contradiction between the rail transit construction in Shanghai and urban traffic congestion, the study on the non-excavation station in soft soil area. Taking Jing’an Temple Station on the 14th line as an example, the station type and general layout of the trenchless station suitable for the soft soil area are studied, and the difficulties in implementing the trenchless station such as the width of the platform, the implementation method, the joint of pipe joints, the earthquake resistance Performance research, and propose solutions.