IFC implementation in lifecycle costing

来源 :Journal of Harbin Institute of Technology | 被引量 : 0次 | 上传用户:huzhouweno
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Life Cycle Costing (LCC) is always a major concern in the Architecture, Engineering and Construction (AEC) industry. This paper presents the implementation of Building Information Modeling (BIM) technology in the development of a lifecycle cost-estimating tool. The IFC (Industry Foundation Classes) model as an interoperable building information model has been adopted as the central data repository to deliver the integrated information of building designs from CAD design systems into the lifecycle-costing database. In this paper, the conceptions and relevant factors, which could affect the LCC estimation, have been introduced. The problems of current LCC applications have been identified as the lack of LCC data and the complexity of LCC exercises. The software application of IFC models and relevant auxiliary are depicted as a solution of the problem identified. The lifecycle costing tool is a part of the nD Modeling tool and as such is based on its integrated interface prototype toolkit and is able to holistically present an IFC model into a 3D virtual reality view, a tree-view and a list of element properties. The functions and some technical points are also detailed in the paper. Through the research, it demonstrates the potential and possibility of implementing BIM methods and techniques, particularly IFCs to enhance the computer applications in the processes of building construction and facility management. This paper presents the implementation of Building Information Modeling (BIM) technology in the development of a lifecycle cost-estimating tool. The IFC (LCC) is a major concern in the Architecture, Engineering and Construction (AEC) industry. Industry Foundation Classes) model as an interoperable building information model has been adopted as the central data repository to deliver the integrated information of building designs from CAD design systems into the lifecycle-costing database. In this paper, the conceptions and relevant factors, which could The problems of current LCC applications have been identified as the lack of LCC data and the complexity of LCC exercises. The software application of IFC models and relevant auxiliary are depicted as a solution of the problem identified. The lifecycle costing tool is a part of the nD Modeling tool and as such is based on its integrated interface prototype toolkit and is able to holistically present an IFC model into a 3D virtual reality view, a tree-view and a list of element properties. The functions and some technical points are also detailed in the paper. Through the research, it demonstrates the potential and possibility of implementing BIM methods and techniques, particularly IFCs to enhance the computer applications in the processes of building construction and facility management.
其他文献
美国矿山局正在进行一项直接加热离析铜矿石的半工业试验,以便获得在非洲毛里塔里亚阿克丘特建立一个选矿厂的设计数据。该厂预计在1966年年底投入生产,年产10,000吨铜和30,
我队使用的电雷管分三种:8号即发,2秒及4秒迟发。这批雷管是1958年8月出厂的,由于储存时间过长,保管不善,部分雷管的外壳发生了氧化铜绿。变了质的雷管,不仅威力小,而且操作
我们经过到现埸较长时间的观测和研究,并多次与矿有关方面交换意见,对应城石膏矿三分矿通风方案的确定作了合理的比较分析。现介绍如下: 一、概况应城石膏矿第三分矿,可采膏
介绍了一种凿岩机开眼时,正确保持选择方向不变的装置。使用这种装置有可能在不同的角度下钻凿垂直和水平的炮眼。装置是由平板,两个相互直交的定位齿条及一个放在 A device
通过合理优化温度控制、轧制控制等方式,减少了炉卷机组生产薄规格板时常出现的瓢曲、镰刀弯和轧废等问题,成材率由70%提升至85%,实现了炉卷机组薄规格板的高效化生产。 By
手掘小平坑是我们勘探地区用以探明浅部矿体获得矿量,为加速矿体深部钻探提供条件既经济又迅速的主要手段.59年,在总路线的光辉照跃下,在党的正确领导下,自开展了“小平坑组
展览:陷阱(群展)时间:2010年10月23日——2011年1月30日艺术家:朱加、李晖、刘韡、彭弘智、孙原+彭禹、林一林、王度地点:艺术Art ISSUE Projects(北京) Exhibition: Traps
综合阿式采煤器和瑞典К-3型采煤器的特点,我们于65年7月份,试制成65—1型采煤器。此种采煤器,在贰号钻机,16号孔,全 Based on the characteristics of the Au coal mines and th
我们曾在普氏硬度系数f=6-8级的岩石、掘进断面为1.8×2米的独头巷道中试验了几次手工快速掘进,取得了日掘7.8米、10.4米和11米的成绩。所用方法是:1.浅打眼多放炮以及打眼与出碴
研究背景:脓毒症是指由感染引起的全身炎症反应综合征(SIRS),是各种微生物及免疫原性物质引发的全身炎症反应和宿主自身的一种免疫性损伤,临床上病情进一步发展可引起严重脓毒