论文部分内容阅读
新建大中型水电站已广泛采用计算机监控技术,中控室的设备布置亦随之有很大的变化。本文介绍中控室布置设计的发展及现代化中控室设计应考虑的问题,其中特别强调利用人机工程学进行设计和多专业配合。
Newly built large and medium-sized hydropower stations have widely used computer monitoring technology, and the equipment layout of the central control room has also undergone great changes. This article describes the development of layout design of the central control room and the issues that should be considered in the design of the modern central control room. Special emphasis is placed on the use of ergonomics for design and multi-disciplinary cooperation.