论文部分内容阅读
介绍了宝兴水电站306.57m长陡倾压力斜井导洞在复杂地质条件下的施工技术,对类似工程的施工具有一定的指导作用。
This paper introduces the construction technology of 306.57m long steeply inclined inclined guide tunnel of Baoxing hydropower station under complicated geological conditions, which has some guidance to the construction of similar projects.