论文部分内容阅读
本文介绍某电厂贮灰场,利用场内软土材料,四面封闭,填筑成相对高度为16m 的高坝施工中,土场的降水处理和坝体施工技术处理要点
This paper introduces the main points of technical treatment of precipitation treatment and dam construction in the construction of a high power ash storage yard, the use of soft clay materials on the site, and four sides of closed high-rise dams with a relative height of 16m.