论文部分内容阅读
论述了铁矿石高价位背景下的生铁成本控制,认为生铁的成本控制是一个系统工程,科学采购是直接手段,生产可控是基础,而科学配矿是桥梁,三者相互联系的同时也相互制约,并提出生铁成本控制的新观点:配矿结构的确定要根据企业自身的地域特点来制定;利用不同矿种的优势和劣势进行互补搭配,并提高冶炼的技术水平,减少原料变化对生产和炉况稳定性的影响,实现效益的最大化。
The control of pig iron cost under the high price of iron ore is discussed. It is considered that the cost control of pig iron is a systematic project. The scientific procurement is a direct means and the production is controllable. However, the scientific allocation of ore is a bridge, and the three are interlinked Mutual restraint, and put forward a new point of view of pig iron cost control: Determination of ore structure should be based on their own geographical characteristics to develop; use of different advantages and disadvantages of different minerals complement each other, and improve the technical level of smelting, reduce the change of raw materials Production and stability of the furnace conditions, to maximize the benefits.