Numerical investigation on the assessment and mitigation of coal bump in an island longwall panel

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:liongliong509
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This study presents a numerical investigation to assess the risk of coal bumps and produces a stress–relief technology using boreholes to mitigate risk during the extraction of an island longwall panel.Based on the geological condition in an island longwall panel in the Tangshan Coal Mine,Tangshan,China,a numerical FLAC3D(Fast Lagrangian Analysis of Continua in 3 Dimensions) model was established to determine and to map the zones in the panel with a high risk for coal bumps.The results of the numerical modeling show that the roof deformation starts to occur at more than 30 m ahead of the longwall face and the deformation starts to accelerate after a distance of 10 m in front of the longwall face.Large and rapid roof deformation is considered to be an important precursor of coal bump occurrence during the extraction of an island longwall panel.Based on the numerical results,a stress–relief technology using boreholes,which was employed to release abutment pressure,was investigated through numerical methods.The modeled results suggest that the peak stress concentration could be released by drilling boreholes in the zones prone to coal bumps.The effectiveness of the stress release increased with the borehole length and decreased with the borehole spacing. This study presents a numerical investigation to assess the risk of coal bumps and produces a stress-relief technology using boreholes to mitigate risk during the extraction of an island longwall panel. Based on the geological condition in an island longwall panel in the Tangshan Coal Mine, Tangshan, China, a numerical FLAC3D (Fast Lagrangian Analysis of Continua in 3 Dimensions) model was established to determine and to map the zones in the panel with a high risk for coal bumps.The results of the numerical modeling show that the roof response began to occur at more than 30 m ahead of the longwall face and the deformation starts to to accelerate after a distance of 10 m in front of the longwall face. Large and rapid roof deformation is considered to be an important precursor of coal bump occurrence during the extraction of an island longwall panel. Based on the numerical results, a stress-relief technology using boreholes, which was employed to release abutment pressure, was investigated th rough numerical methods.The modeled results suggest that the peak stress concentration could be released by drilling boreholes in the zones prone to coal bumps.The effectiveness of the stress release increased with the borehole length and decreased with borehole spacing.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
针对当前建筑市场和工程质量存在的突出问题,从今年9月开始,住房城乡建设部在全国启动了为期两年的工程质量治理行动。近日,住房城乡建设部相关负责人就工程质量治理两年行动的
目的 探讨苯扎氯铵对血管吻合手术模型大耳白兔动脉阻力指数(resistance index,RI)、搏动指数(pulse index,PI)的影响及意义,阐明不同浓度的苯扎氯铵溶液与血管壁刺激程度之
在当今的社会,地铁是城市中的最重要交通工具之一,它有着很多的优点,比如它行驶速度很快,对污染环境的程度小,既节能又环保,给人们的日常工作和学习生活都带来了很大的方便,
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
采用浸泡、半浸泡的试验方法,定期检测混凝土的超声声速和抗压强度,并观察不同腐蚀期试件的表观现象.结果表明:随着腐蚀时间的增长,试件腐蚀层厚度逐渐增加,腐蚀速率先降低后
研究背景伦敦交通实施处(DTO)隶属于市运输部地面交通管理部门,其主要职能是负责对全市6000个交通信号及其辅助系统、相关技术和设备进行运营和管理。在交通实施处(DTO)内部,
(接上期)rn3.3粉磨方法对水泥强度的影响rn随着水泥粉磨技术的不断发展,出现了多种粉磨设备,如球磨机、立磨、辊压机和筒辊磨等,并且以这些设备加上选粉机又组成多种粉磨系统
从安信毒地板事件再到因劣质保温材料燃烧性能不合格造成吉林宝源丰禽业公司火灾事故,桩桩事件表明,建材产品不合格已成为引发事故的重要因素,遭到安全拷问。日前,又有多家卫