与大量风电被弃一样,光伏发电也在遭遇同样的命运。自2009年金太阳工程实施4年以来,批复装机容量约3.23GW,“90%甚至更多的项目并未获得电网并网的许可。”即使在获得电网原则性同意并网的批复后,要走完所有程序可能还要等上一年半载,大量的并网花费还在后面。所以项目建成不等于并网获批,只能“晒太阳”。即使获得电网并网许可,项目最终的经济性都是问题,更不要说运营赢利。与弃风不同的是,风电是大规模集中式并网,而金太阳
As with a large number of wind power abandoned, photovoltaic power generation is also encountered the same fate. Since the implementation of the Golden Sun Project in 2009, the installed capacity has been approved to be about 3.23GW, and “90% or more of the projects have not been approved by the grid integration.” Even after obtaining the approval of the grid agreement in principle, To finish all the procedures may have to wait a year or so, a large number of grid-connected spending is still behind. Therefore, the completion of the project does not mean that the grid is approved, only “sun”. Even with grid access, the ultimate economics of the project is a problem, let alone operating profitability. The difference is that with the abandoned wind, wind power is a large-scale centralized network, and the golden sun