论文部分内容阅读
通过对向家草拦河坝部分消能设施损坏的分析研究,得出了消能设施改造设计的关键在于找出最不利设计条件和尾水位的变化趋势这一结论.
Through the analysis of the damage to some energy dissipation facilities in Xiangjiacao Barrage, the conclusion is drawn that the key to retrofit design of energy dissipation facilities is to find out the most unfavorable design conditions and the change trend of tail water level.