荷兰艾莫伊登公司的喷煤系统

来源 :武钢技术 | 被引量 : 0次 | 上传用户:richard_kai
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
荷兰霍戈文艾莫伊登钢铁公司有一套1982~1983年建造的阿姆科型喷煤系统。该系统自投入使用以来一直运转正常,没有发生大的停工事故。该系统有一磨碎设备,包括2台碎煤机,为6号和7号高炉供煤。该系统大部分时间喷吹高挥发性煤,其置换比符合理论值,平均为0.93kg焦(87.5%C)/kg煤。 1988年碎煤机能力从30t/h增加到50t/h,因而吨铁喷煤量从100kg增加到140kg。 1991年初7号高炉4星期喷煤量达210kg/t铁。在此期间,焦耗量下降到291kg/t铁,其 Hooghoven, the Netherlands, has a set of Amco-type coal injection systems built between 1982 and 1983. The system has been operating normally since it was put into operation without major downtime. The system has a grinding equipment, including 2 crusher, for the 6 and 7 blast furnace for coal. The system injects highly volatile coal most of the time, with a replacement ratio that meets the theoretical value, averaging 0.93 kg coke (87.5% C) / kg coal. In 1988 crusher capacity increased from 30t / h to 50t / h, so the amount of iron per ton of iron increased from 100kg to 140kg. At the beginning of 1991, the blast furnace burned 210kg / t iron for 4 weeks. During this period, the coke consumption dropped to 291kg / t iron, which
其他文献
1.征稿内容根据总公司的指示及全省冶金工定实际情况,征稿内容主要有三个方面:提高质量、节能降耗和开发新品种。具体内容有:①提高矿山生产率,降低贫化损失,降低成本;②型
冶金部科技司主办的冶金新材料工作会议于lg90年6月12~16日在上海召开。参加会议的除冶金系统的大中型企业、省市冶金厅、局、高等院校和科研院所外,还邀请了有关部、委及所
据《美国金属市场报》报道,1989年2月投产的田纳西州谢尔比维尔(shelbyville)市再生铝厂已停止生产,进行拍卖,标价6百万美元。据南方合金公司代理总裁与销售总经理布鲁纳说:
·采矿·论乌什卡腾-Ⅲ锰矿床合理开拓与开采方法[刊,俄]/-1991,(12).-35~37 大规模地开采乌什卡腾-Ⅲ锰矿床,可以使锰矿和铁合金生产部门中含磷这类关键问题得到很大的缓和
据新华社全国农副产品和农资价格行情系统监测,与10月28日相比,11月4日普通鲜鸡蛋全国均价下降3.9%,每斤下降0.15元。至此,鸡蛋周均价已连续7周下降,降幅有扩大趋势。除海南
中国金属学会与冶金部能源办公室联合举办的1992年铁矿石烧结生产节能技术知识竞赛,在各企业的热情支持、积极配合下已圆满结束,竞赛结果已经揭晓,共评出一等奖14名、二等奖
2C0 831 632 70今Jgq公q﹄叹公Od 518 49n。4。白7211勺‘六jo口0 01︸l只只︺O2 1 1 12。︸,‘。﹄-,J,‘。‘,-1 78243248 组织和性能的影响··················…