论文部分内容阅读
通过水工模型试验对海南红岭水利枢纽溢流表孔消能形式进行优化研究,结果表明采用扭曲鼻坎挑流消能工,在使下泄水流对坝下河道冲刷减小的同时,可有效降低泄流产生的雾化对电厂运行的影响。
Through the hydraulic model test, the energy dissipation form of overflow table in Hongling Multipurpose Project of Hainan Province is optimized. The results show that the use of twisted nose cantilever energy dissipater can reduce the scour of discharged water flow to the lower reaches of the dam while being effective Reduce the impact of leakage caused by the operation of power plants.