论文部分内容阅读
根据二机部下达的60万千瓦核电站的研究设计任务,二机部第一研究设计院(以下简称一院)于七月九日至十六日在北京召开了60万千瓦压水堆核电站主设备方案设计讨论会。应邀到会的有国防科委、一机部、二机部、电力部、冶金部等所属的有关设备研制厂、所及各部直属机关共30个单位92名代表。提交会议讨论的有反应堆压力容器、蒸汽发生器、稳压器、主泵、主管道、堆内构件、驱动机构、透平发电机组、工艺运输等等九项主要设备的设计方案。会议分为总体方案报告、主设备方案设计分组报告、分组讨论、对口单项专题讨论、总结等。
According to the research and design mission of the 600MW nuclear power station issued by the Second Machinery Department, the first research and Design Institute of the Second Machinery Department (hereinafter referred to as “First Research Institute”) held a 600MW PWR nuclear power plant in Beijing from July 9 to 16 Equipment design seminar. At the invitation of the meeting, there were 92 related research institutes affiliated to the State Commission of Science and Technology for Science and Technology Commission, Ministry of Machine Building, Ministry of Machinery Industry, Ministry of Electric Power, Ministry of Metallurgy, etc., and 92 representatives of 30 units directly under the ministries and commissions. Submitted to the meeting discussed the design of nine major equipment such as reactor pressure vessels, steam generators, voltage regulators, main pumps, main pipeline, reactor components, drive mechanism, turbine generator set, process transportation and so on. The meeting is divided into the overall program report, the main equipment program design group report, group discussions, counterparts monographs, summarizes.