目前正在建设中的卡拉维斯工程,也称斯坦尼斯拉斯河北支流水力发电开发工程,它位于美国圣佛兰西斯科以东约200km的内华达山区中.这项投资2.76亿美元的工程,其主要特点是包括14.6km长,水头达690m的高压隧洞;分阶段的地质调查研究和精心的设计,节约了大量的投资(见Water Power&DamConstruction,September1987,for the general aspectsof this project).本文叙述了科利尔维尼水力发电隧洞的地质调查研究和设计思想.
Currently under construction, the Kalawesi Project, also known as the Stanislas Hebei Tributary Hydroelectric Power Development Project, is located in the Sierra Nevada, about 200km east of San Francisco, USA The $ 276 million project, Its key features include a high pressure tunnel of 14.6km in length and a water head of 690m; significant geological investment and research have been achieved through phased geotechnical investigations and careful design (see Water Power & Dam Construction, September 1987, for the general aspects of this project) Geological Survey and Design of Collierville Hydropower Tunnel.