论文部分内容阅读
水电七局机电安装分局是中国水利水电建设集团公司中一支颇具实力的专业技术队伍,四十多年来足迹遍布神州山山水水,从三门峡水利枢纽工程建设到三峡水利枢纽工程的施工,积累了丰富的经验。并多次踏出国门,名扬国外。近年来,在三峡水利枢纽工程施工中,他们出色地完成了左岸厂房5号~8号机组埋件及安Ⅲ段机电设备一期埋件、尾水闸门等金属结构安装,左厂1200/125t桥机安装,永久船闸双线六闸首人字闸门、反向弧形闸门等金属结构的安装工程并在科技创新方面取得了一定成果。
Hydropower Seventh Bureau Mechanical and Electrical Installation Branch of China Water Conservancy and Hydropower Construction Group, a considerable strength of the professional and technical team, more than 40 years of footprints all over the mountains and rivers, from Sanmenxia Project construction to the Three Gorges Project construction, accumulation A wealth of experience. And repeatedly set foot in the country, famous abroad. In recent years, during the construction of the Three Gorges Project, they completed the first-stage metalworkings such as the first-stage embedded parts and the tail gate of electromechanical equipment of No.5-No.8 units of Left Bank Powerhouse, and the first factory of 1200 / 125t Bridge machine installation, permanent ship lock two-lane six gate headshots, reverse arc gate and other metal structures of the installation and technological innovation has made some achievements.