大唐苏州热电有限公司是由中国大唐集团公司调整能源结构、发展清洁能源战略而诞生的集团公司在江苏第一个自建燃机项目。该项目利用“西气东输”的天然气作为燃料,一期工程静态总投资约12.6亿人民币,规划建设两台E级燃气—蒸汽联合循环热电联产机组,同时留有扩建二期的余地。两套机组已分别于2013年3月和2013年5月投入运行,极大的提高了对开发区的供热能力,实现了节能减排。
Datang Suzhou Thermoelectricity Co., Ltd. is the first self-built gas turbine project in Jiangsu Province which was born by China Datang Corporation in adjusting energy structure and developing clean energy strategy. The project uses natural gas from “West-East Gas Pipeline” as fuel, with a total static investment of about RMB1.26 billion for the first phase of the project. Two E-Class gas-steam combined cycle combined heat and power units are planned and constructed, with the second phase of expansion room. The two sets of units have been put into operation in March 2013 and May 2013, respectively, which greatly improved the heating capacity of the development zone and realized energy saving and emission reduction.