1 前言刘家河滚水坝工程位于陕县瑶店刘家河上游,大坝以上控制流域面积20km~2,设计标准20年一遇,相应最大洪峰流量372m~3/s,该工程主要由大坝及混凝土防渗墙、右岸护坡及陡坡组成,大坝为浆砌石溢流重力坝,长110.8m,其中溢流段长46m,最大坝高8.5m。该工程形成最大水面2.5万,库容7万m~3,为一小型水利工程,兴建该工程对防治水土流失,减轻下游
1 Introduction The Liujiahe Roller Dam project is located in the upper reaches of Liujia River in Yao County, Shanxian County. The control basin above the dam covers an area of 20km ~ 2. The design standard is once every 20 years and the corresponding maximum flood peak flow is 372m ~ 3 / s. The project is mainly composed of dam and concrete Permeable wall, right bank slope protection and steep slope, the dam is a masonry overflow gravity dam with a length of 110.8m, of which the overflow section is 46m long and the maximum dam height is 8.5m. The project has a maximum surface area of 25,000 and a storage capacity of 70,000 m ~ 3. It is a small-scale water conservancy project. The construction of this project is of great significance to the prevention and control of soil and water loss,