论文部分内容阅读
火车以七十公里的时速在金(边)马(德望)线上奔驰。这是柬埔寨王国唯一的铁路线,它跨越甘拉、磅七卑、磅清扬、菩萨和马德望五个省份,在巴比同泰国的铁路相连。日子虽然已到了12月中旬,但窗外的庄稼正在黄熟,只有小部分稻谷已经收割。这一年,1959年,由于雨季推迟了一到两个月,柬埔寨各地的耕种季节也随着推迟,收割期自然也就晚一些。柬埔寨12月的气温,恰像我国南方8月的天气,如果田野
The train runs at a speed of 70 km / h on the horse side. This is the only railway line in the kingdom of Cambodia. It crosses over five railroads in the provinces of Gambla, Pounds, Pounds, Pokhara, Pusa and Battambang, with the Thai railroad in Babi. Although the day has come to mid-December, the crops outside the window are ripening and only a small part of the rice has been harvested. This year, in 1959, due to the postponement of the rainy season by one or two months, the cultivation season in various parts of Cambodia was postponed and the harvest period was naturally later. The temperature in Cambodia in December, just like the weather in southern China in August, if the fields