1 工程概况柘林水库位于江西省修河中下游,控制流域面积9340km~2,总库容79.2亿m~3,装机4×4.5万kW,总装机容量18万kW,灌溉农田2.67万km~2(40万亩),防洪保护农田1.47km~2(22万亩)。工程于1958年动工,1962年停工缓建。1970年9月复工,1971年底土坝填筑基本完成,1972年春蓄水,同年第一台机组发电,1975年6月4台机组全部投入运行。土坝为粘土心墙坝,最大坝高62m,坝顶高程72m,
1 Project Overview Zhelin Reservoir is located in the middle and lower reaches of Xiu River in Jiangxi Province, the control basin area of 9340km ~ 2, the total storage capacity of 7.92 billion m ~ 3, installed capacity of 45,000 kW, with a total installed capacity of 180,000 kW, irrigated farmland 26,700 km2 ( 40 acres), flood protection farmland 1.47km ~ 2 (22 acres). Construction started in 1958, 1962 suspended construction. Reworked in September 1970, by the end of 1971, the earth dam construction was basically completed. In the spring of 1972, water was impounded. In the same year, the first generating unit was used to generate electricity. All four units were put into operation in June 1975. Earth dam is a clay core wall dam, the maximum dam height 62m, crest elevation 72m,