为了制止经常发生在一个深达45m的路堑中的一系列山体滑坡,在柯尼希施山(Konigsberg)附近维也纳A2至格拉茨高速公路之间,建设了一条187m长的隧道。自从80年代早期高速公路修建以来,柯尼希施山(Konigsberg)附近的路堑就不断遭遇山体滑坡,这需要昂贵的山体稳固工程来加以防范。 那种试图用直径1.5m、长30m的巨大的有孔装置问题频出的山岬和大量石头支撑体的水淘干的做法只是权宜之计。 在降水量大的年份,这一粘土和糜棱岩质断层区仍然存在着移动。 当60m长的预制力支撑堆都没有达到预期效果时,在地理学专家、大学教授亨氏·伯兰德博士的协作之下,人们构想了一个新的修复方案。 伯兰德教授的方案已实现,它的目的是建成一种一劳永
In order to stop a series of landslides that often occur in a 45m deep cut, a 187m long tunnel was constructed between Vienna A2 and the Graz expressway near Konigsberg. Since the construction of the highway in the early 1980s, the cutting edges near Konigsberg have suffered from landslides that require costly mountain stabilization to prevent them. It is only a stopgap measure to try to dry the water with a large caving headstock and a large number of stone supports with huge holes that are 1.5m in diameter and 30m in length. In years of heavy rainfall, there is still movement in this clay and mylonitic fault zone. When the 60m precast props did not produce the desired results, a new restoration was conceived with the collaboration of geographer and university professor Dr. Heinz Burland. Professor Branlander’s program has been achieved, and its purpose is to create a once and for all