一、工程概况 淮安枢纽立交地涵工程基础底部设钢筋混凝土防渗墙,防渗墙成两对称的π字形布置在地涵两侧,以截断京杭运河与立交地涵地下的水力联系,防止地涵基础产生渗流破坏。除防渗墙外,在立交地涵四角岸墙与运河翼墙接缝处各设一道支护墙,以减小翼墙下基础土对岸墙的侧向挤压力和减少岸墙基础土方开挖与回填量,从而降低成本,缩短工期。
First, the project profile Huai’an Jiefang to Culvert engineering foundation at the bottom of the reinforced concrete cutoff walls, cutoff wall into two symmetrical π -shaped layout in both sides of the culvert in order to cut off the Beijing-Hangzhou Grand Canal and the interchange of culvert underground hydraulic connection to prevent Culvert base damage caused by seepage. In addition to the anti-seepage walls, a supporting wall shall be set at the seams of the four corners of the culvert and the sewer wing wall of the interchange to reduce the lateral crushing force of the foundation soil below the wing wall and reduce the earthwork of the bank wall Digging and backfill volume, thereby reducing costs and shorten the construction period.