从井筒提到地面后的废石运输是装岩与提升工艺过程的继续,并从属于上述工艺过程。本文提出的井筒掘进时地面废石运输方案的选择方法基于以下基本原则: 地面废石运输是井筒掘进循环的组成部分,并间接的影响这一循环的延续时间; 按无中间废石仓向自卸汽车装车方案做为基础;
Waste rock transport from the wellbore to the ground is a continuation of rock loading and lifting processes and is subordinate to the above process. The selection method of ground-based waste rock transportation scheme proposed in this paper is based on the following basic principles: The transportation of ground-based waste rock is an integral part of the wellbore driving cycle and indirectly affects the duration of this cycle; Unloading car loading program as a basis;