在膨润土浆体混合物中掺以粉煤灰,可使坝内防渗截水墙的建筑费用减少10%以上。马斯金格姆坝使用的填料主要是砂质多孔炉渣。该坝长457m、高19.80m,建于1968年,建坝的目的是为了拦蓄马斯金格姆河热电厂当时新建的第5台机组排出的炉灰。
The addition of fly ash to the bentonite slurry mixture can reduce the construction cost of the seepage cut-off wall in the dam by more than 10%. The filler used at Muskingum dam is mainly sandy porous slag. The dam, 457 m long and 19.80 m high, was built in 1968 to dampen the ash discharged from the newly-built fifth unit at the Muskingum Thermal Power Plant.