论文部分内容阅读
国务院近日发出通知,批转水利部关于加强长江近期防洪建设若干意见,对长江近期防洪建设作出全面规划和部署,确定采取综合措施,加快建设长江综合防洪体系。去年发生大洪水后,中央、国务院及时对灾后重建、整治江湖、兴修水利作出全面部署。为了贯彻落实中央的部署,水利部于1998年11月中旬开始对长江近期防洪建设中的有关问题进行调研、分析,在此基础上形成了初步
The State Council recently issued a circular circling a number of opinions from the Ministry of Water Resources on strengthening the flood control of the Yangtze River in the near future and made overall planning and deployment of the flood control in the Yangtze River in the near future. It decided to take comprehensive measures to speed up the construction of a comprehensive flood control system in the Yangtze River. After the great flood last year, the Central Government and the State Council promptly made overall arrangements for post-disaster reconstruction, remediation of rivers and lakes and construction of water conservancy projects. In order to carry out the deployment of the Central Government, the Ministry of Water Resources started to investigate and analyze the relevant problems in the recent flood control construction of the Yangtze River in mid-November 1998, and based on this,