风化残积土水坠坝

来源 :中国水土保持 | 被引量 : 0次 | 上传用户:pz11200618
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、概 述 水坠法筑坝是属于一种湿法筑坝。在六十年代初期,广东省已开始用风化残积土建造水坠坝。当时我们称为半水力冲填法筑坝,但这一筑坝方法没有得到发展。迨至1975年陕晋两省用水坠法筑坝的先进经验传入我省,水坠法筑坝在广东才再次兴起。据不完全统计,到1983年底已建成水坠坝60余座,遍布全省各地。已建成的水坠坝最大坝高68米,最大库容8千多万立米,其中坝高50米以上的有8座,40~50米的有10座。 First, an overview Water fall law dam belongs to a wet dam. In the early 1960s, Guangdong Province started to use water weathered residual soil to build water crashed dams. At that time, we called the semi-hydraulic impounding dam, but this dam has not been developed.迨 to 1975 Shaanxi and Shanxi provinces using water fall method of dam advanced experience imported into our province, water fall method of dam construction in Guangdong only once again rise. According to incomplete statistics, by the end of 1983, more than 60 water-dropping dams have been built across the province. Has built a water dam the maximum dam height of 68 meters, the maximum storage capacity of more than 80 million cubic meters, of which dam 50 meters above the 8, 40 to 50 meters have 10.
其他文献
本文结合三维高分辨率地震的特点 ,对大庆探区太 190三维开发研究区的施工参数进行了论证和选取 ;探讨了井深和仪器因素的选取原则及方法 ;从检波器及其与地面的耦合关系出发
对鄂东南所发现的产在大岩体中、受断裂破碎带严格制约的晚期蚀变中酸性岩脉的破碎带“蚀变岩”型金矿床宝盖垴金铜矿的成矿地质条件进行归纳 ,并建立该类型矿床地质─地球物
在黄河河床内和冲积平原上,广泛分布着与水工建筑物地基有密切关系的新近冲积的粉、细砂层,为了取得黄河新近冲积砂层的允许承载力和变形指标,黄委会曾在河南省巩县神堤西侧
本文对滚动轮胎的热平衡状态,建立了合理的数学及物理模型,用有限元法对9.00-20尼龙胎进行了模拟计算,得出轮胎内部的温度分布,并对几种不同工况下缓冲层的温度进行了讨论。
水流中的紊动输送是水利工程及环境工程的一个重要课题。本文对其现状及发展途径做了综合评述,并说明有关各学科的相互联系。本文共有五个部分:引言,基本方程,水流中紊动输送
破冰是防凌的主要措施之一,在黄河下游历年防凌斗争中发挥了很大的作用。破冰的方法很多,如:人工打,破冰船撞压,大炮轰,飞机炸,炸药爆破等,可视地点、条件、冰情、时机分别
昆明理工大学与云南化学化工学会以丙烯酸丁酯、丙烯酸、聚乙烯醇和醋酸乙烯(VAc)等为主要原料,添加OP-10、链转移剂等助剂,经乳液三元共聚制成高速卷烟接嘴胶粘剂。该胶粘剂
Tecogen公司目前提供一种涡轮增压型Tero-drive7000发动机。Tecodrive7000T是一种重型、燃用天然气的V8型点燃式发动机,其排量7L。额定功率在转速3600r/min时为183kW,扭矩在
在新型轿车开发阶段,首先要确定车身造型的基本参数,例如全长、总宽、总高、轴距、轮胎型式和车身环线高度等。这些参数之间应遵循一定的比例关系,即所谓“黄金分割法”。黄