云南陆良天生桥电站系县办中型水电站。建于南盘江上游,引水迳流发电,总装机容量共7250KW,1号、2号机单机容量为3000KW,3号机为1250KW,均为混流式竖轴机组;电站于八○年投产,供县区用电,并与省大电网连接,为陆良县的主力电站。自投入运行以来,电站及设备运行基本正常。八三年该站对3号机进行大修后,出现机组下导轴瓦温度升高的现象,在气温超过15℃时,下导瓦温超过60℃,限制出力在1000KW以下才能勉强进行。与大修前相
Yunnan Luliang Tianshengqiao Hydropower Station, a county-level hydropower station. Built in the upper reaches of Nanpanjiang River, diversion and power generation, total installed capacity of a total of 7250KW, No. 1, No. 2 single machine capacity of 3000KW, No. 3 machine 1250KW, are mixed flow vertical shaft unit; power plant put into operation in 1980, For the county electricity, and with the provincial power grid connection, as the main power plant in Luliang County. Since put into operation, power plants and equipment operation basically normal. After the station overhauled to No. 3 in 1983, there was a phenomenon that the temperature of the lower guide bush of the generating unit increased. When the temperature exceeded 15 ° C, the lower leading-edge wattage exceeded 60 ° C, and the output limit was limited to 1000kW. With overhaul before phase